VP Completion Campaign — Hub

Bookmark this tab. Everything clickable. Refreshes as slices land. · 2026-07-11
★ MISSION CONTROL the single pane — done-definition, your role, the live fleet, tracking to 10/10

Needs you 0 OPEN

Nothing — next item will be HITL-04 (the redone lens surface) after it passes Claude's gates

The demo (live on this machine)

PO Tracker the one screen, every stakeholder — viewer switcher after redo v2 lands Dashboard Messages (threads on the spine)

Verified HITLs

Slice 2 — Messages · PASSED 6/6 Slice 3 — Connections · superseded by redo v2 (invention caught)

Reference

JTBD SCOREBOARD the evaluation instrument — 40 jobs, anchored 0–10 rubric, complete = all at 10. Score in-page, export, Claude ingests. JTBD Coverage (source inventory) jobs × tooling × status What Great Looks Like · v1 vision · values · experience standard with exemplars · the reference shelf — cited in every codex spec from now on Ingestion Plan v1.1 · APPROVED connector go-live order: D365 → bridge-orders → Collmex → email → Excel-upload → WhatsApp → trade register AC Canon v1.3 the vision as testable ACs Completion Board 86 rows, gates flip only with evidence Code Atlas anti-reinvention index

GitHub

PR #763 — spine PR #765 — messages PR #766 — connections (redo lands here) Issue #764 — schema proposals for Allan